Friday, October 22, 2010

bamboo construction( 22 OCT 2010)

MORNING SESSION....


SCHEDUALE FOR THE XZBIT WHICH WILL BE HELD ON THE 25 OCT 2010....








WA N B SAID THAT SINCE NAFIS AND THE GANG HAD WROTE A POEM

FOR THE ABSTRACT, INSTEAD OF A WASTE HE DECIDE TO

MAKE USED OF IT AS THE OPENING

OF THE SOUL SHIFT...










OVERALL SCHEDUALE...




SELECTED GROUP FOR THE PRESENTATION





LAYOUT FOR THE CONFERENCE AND XZBIT


AFTERNOON SESSION


IN THE AFTERNOON SESSION BACK TO

BAMBOO...



ISSSHHH....




YOU WATCH OUT...






STOP LOOKING AT THE CAMERA...


FOCUS ON YOUR WORK...





FINALLY DONE...
SO HAPPY




WAOooooo......

SO MANY PEOPLE IS STIL WAITING...

WHEN ZID GOING TO BE MY TURN...




WONDERING WILL THIS 8M HEIGHT DOME CONSTRUCTION

BE A SUCCESS OR FAILURE...

ALL MY SWEAT, HARD WORK AND MY PRESCIOUS TIME HAS BEEN

SPLASH ON THE BAMBOO...

CAN WAIT 2 SEE THE END PRODUCT...



REJECT...!! REJECT..!!REJECT..!!

DO YOU KNOW THAT THIS IS THE 4TH BAMBOO D THAT

IM ATTEMPTING TO...

IT IS AS EASY FOR YOU TO SAY REJECT BUT DO

YOU KNOW WHAT OUR FEELING..

OOOH NO MY HARDWORK, MY EFFORT, MY PREETY HAND IS ALL GONE

WITH JUST A WORD 'REJECT'
AAAAHHHH...

THIS IS REALLY A GREAT EXPERIENCE AND FEELING

THAT YOU ARE SOON TO FACE IN FUTURE...

THE GREAT DEEP FEELING OF YOUR PROJECT BEING REJECT...


ABOUT TO GO BACK.....



Bamboo construction (21 Oct 2010)

The atmosphere as i arrived there...













siapa yang ikat ni?? longgar sangat..


BUKA dan IKAT semula....










MACAM NI BARU BETUL, dik....





PULL PULL HARDER...
you din eat rice hor....
(ooh no my preety smooth hand gone d)





okay correct d...
tie a knot there...



whose work is this??? do half way then ran away..







finally complete d...





miss can i have a cup of drink please...



NEXT CONTINUE WITH OUR BAMBOO CONNECTOR...

LETS BARBEQUE...

ANYONE WOULD LIKE TO HAVE SOME

BBQ PVC PIPE...

IS NICE AND DELICIOUS...



THE DAY IS GETTING DARKER...

IS TIME TO PACK UP AND "BELAH"..

TO BE CONTINUED TOMORROW...

Tuesday, October 19, 2010

Abstract

In conjunction with the topic mind shift- Awakening as one


we are ask to create a group of 5 major to come out with 300 words and followed up with 1500 words abstract based on the topic time for talk alone is dying: we need to unite, share, serve and see changes.

pOsteR















xZbit

My dymaxion, my arts of memory...
-practically it can be seen that this is the piece of work that i really slash so much effort on producing it...time on editing the pictures,patience on drawing, cutting and pasting...


DRawiNG
CuTTinG
PicTurEs
CuT & PaSte
FiNal pRoducT



BIG Conference of making a leap to 2012

BIG is a bamboo interest group that have the interest, passion to study and work on the bamboo 'to create this desire of saving the world in order to make a perfect leap in 2012.
A conference was conducted to further elobrate on the huge leap in 2012 in conjunction to execute the Accelerated Programme for Excellent (APEX).
Wan B began with the introduction about BIG then proceed to the role and characteristics of the bamboo and why they choose bamboo as the title for this programme....
*the strongest choice to built eco-friendly future on
*incredible strength, regenerative propreties and its natural aesthetic beauty
*most sustainable resource
*pathway out of poverty
*can survied the atomic bomb
*reverse the effect of global warming
* work on the mamboo so as to produce something that meet the all the need in making a leap to 2012.

WHAT CAN WE DO???

under our studio 101 we are now working on constructing a huge dome of an approximation of 8m height...so challenging and really tough...so much sweat and effort had been raise in order make this project a success but it seem that we are facing some technical problem with the connector of the bamboo...most of it loosen
would i consider this a failure...
to be continued in the coming episode..
but i think that this project would work if each and everyone of us play our parts and may we be unite and work as a team...
so lets us prepare for the worse and the worst to come...

Friday, October 15, 2010

mission continued

BAMBOO....BAMBOOO...BAMbooooo...
ever since i enter hbp til now...
everything is stil got to do with bamboo...
eat bamboo, sleep bamboo, everything oso bamboo...
one day surely bang by the bamboo...
oopps lets get back to the bamboo construction...
lets see what happen on 12 Oct 2010
construction failed.....
due to certain reason like the connector loosen, uneven bamboo lenght and ect. which lead to uneven distribution of weight between the bamboos
As a result of that, construction collapse....
Taking is not enough, the key to success are co-operation and team work...







Sunday, October 3, 2010

7 IBU Prototype-4th Day

about to finish....

soften the pipe to make it flat...
cutting the excess side of the pipe...

smoothing the side surface...


mark and screw a hole...



the end product of the connector...


back to the bamboo...


thinning both end of the bamboo so that it is fix into the connector



DONE.....